1. What CLASS of fire is an electrical fire ?
2. Which of the following electrical power tools is the safest to use on a construction site?
3. What is the primary role of a contracts manager working on a large electrical contract ?
4. What type of drawing or diagram shows the operation of an electrical system ?
5. What type work is likely to be carried out by electrical contractors who possess a part ‘P’ qualification ?
6. Why does an electrical supply need to be isolated before carrying out work on the circuit ?
7. How should a voltage indication device be checked for correct operation?
8. What type of sign has a green background and a white symbol?
9. By what name are the electrical safety standards for voltage detecting devices known ?
10. If someone is found lying on the floor across an exposed live electrical cable, what is the first action to be taken?
11. Which one of the following is the primary responsibility of all employers ?
12. Who has responsibility for ensuring that correct PPE is provided for work activities?
13. A portable appliance (PAT) test is used to :
14. Under COSHH, propane gas is regarded as:
15. What type of electrotechnical company is most likely to be involved in the installation and maintenance of traffic lights and other street furniture?
16. Who makes the laws and regulations?
17. What is the colour of the identification band on a carbon dioxide fire extinguisher?
18. Which one of the following statements is true of BS7671:2018?
19. If you extend your ladder to 5.0 metres, how far from the base of the wall does it need to come out?
20. While reading a risk assessment for a task you have been instructed to
perform, you identify a hazard which is not recorded on the form. Do you:
21. When putting together a mobile scaffold tower, what do the out-riggers do?
22. You are working on a multi-trade site and need to use a step ladder but your stepladder is in the van. You ask someone if you can borrow their stepladder for a minute. You are handed a stepladder which is different to your normal one. Which of the following would be wrong?
23. Which item is missing from the fire triangle if fuel and oxygen is present?
24. You injure yourself at work and use the first-aid kit to deal with your injures. What procedures must you undertake?
25. What would be the preferred choice of power tools when drilling a hole in the wall at a customer’s house?
26. What is the most important thing to do before using power tools?
27. An accident occurs on site and you were present to initally help with the situation. What does not need to take place after the patient has been taken to hospital?
28. You are working on site and have been asked to display a circular sign with a red line outline, the image of a person walking and a red line crossing through the image. When would be the correct time to display this sign?
29. What regulations relate to the disposal of electrical equipment?
30. Who must provide personal protective equipment for site work?
31. You need training to become competent in the use of a circular saw. What regulation covers this requirement?
32. What voltage would be used on a building site ?
33. What type of fire is classed as class C?
34. Which type of fire extinguisher would you use on a electrical fire?
35. What colour band does a fire extinguisher containing Foam have ?
36. If you find someone who has had an accident what should you not do ?
37. What does CPR stand for ?
38. If you discover a fire and it is small enough to tackle, what should you always consider before tackling the fire ?
39. Under the Health & Safety at Work Act (HASAWA) :
40. Which of the following is not a requirement to check before you start working on an existing socket outlet in a busy corridor of an office?